Article 74: Build-operate-transfer (BOT) projects

Defines build-and-operate contracts in their forms (such as BOT, BOOT, BOO and AOT) and the lessor and lessee in them, and lets the lessor deduct such projects from the zakat base when set conditions are met.

What it means in practice

  • These are investment contracts in which the lessor builds and operates an income-generating asset and supplies its benefit or output to the lessee for lease payments; a contract where the asset alone is what is sold is not included.
  • Lessor: the builder, producer, developer or seller of the benefit, goods or service; lessee: the beneficiary or buyer of the benefit, goods or service, in all forms of these contracts.
  • Conditions for the lessor’s deduction: it undertakes to build the project and operate it to sell the benefit, goods or service for the whole contract term, and the lessee, or its successor, undertakes to buy them from it for that term.
  • The contract must mainly concern operating the asset, not financing it; if it is in substance financing, there is no deduction whatever the classification. The lessor must not be a financing-activity payer, the assets must be non-current for it, and its activity must match the project’s.

The official text

Arabic (the authoritative text)

1. يقصد بمشروعات البناء والتشغيل: هي عقود استثمارية تهدف إلى إيجاد الأصول المنتجة والمدرة للدخل، ويتولى فيها المؤجر بناء الأصل المنتج المدر للدخل وتشغيله مقابل بذل منفعته وإنتاجه للمستأجر الذي يتحصل على (المنفعة/الإنتاج)، مقابل الالتزام بدفعات الإيجار لصالح المؤجر، ولا يدخل في ذلك ما إذا كان المبيع هو الأصل وحده، وتتنوع عقود البناء والتشغيل في صورها وآلياتها وأهدافها، ومنها على سبيل المثال لا الحصر:

أ- عقود البناء والتشغيل والتحويل (BOT).

ب- عقود البناء والتملك والتشغيل والتحويل (BOOT).

ج- عقود البناء والتملك والتشغيل (BOO).

د- عقود الشراء والتشغيل والتحويل (AOT).

2. لأغراض هذا المادة؛ يقصد بالمؤجر: المُنشئ أو المُنتج أو المُطوّر أو بائع المنفعة أو السلعة أو الخدمة في عقود البناء والتشغيل ونقل الملكية بجميع صورها.

3. لأغراض هذه المادة؛ يقصد بالمستأجر: المستفيد أو مشتري المنفعة أو السلعة أو الخدمة في عقود البناء والتشغيل ونقل الملكية بجميع صورها.

4. تحسم مشروعات البناء والتشغيل والتحويل ونحوها من الصور المماثلة لدى المؤجر إذا تحققت الشروط الآتية:

أ- التزام المؤجر بإنشاء المشروع.

ب- التزام المؤجر بتشغيل المشروع لغرض بيع المنفعة أو السلعة أو الخدمة طول مدة العقد.

ج- التزام المستأجر -أو من يحل محله- بشراء المنفعة أو السلعة أو الخدمة من المؤجر طول مدة العقد.

د- أن يكون محلّ التعاقد بشكل رئيس هو تشغيل الأصل، لغرض إنتاج وبيع المنفعة أو السلعة أو الخدمة، وليس تمويل الأصل بعينه، فإذا تبيّن أن حقيقة المعاملة هي تمويل للأصل؛ فلا يحسم من الوعاء الزكوي بغضّ النظر عن تصنيفه في القوائم المالية.

ه- ألا يكون المؤجر من مكلفي أنشطة التمويل.

و- أن تكون هذه الأصول مصنفة كموجودات غير متداولة لدى المؤجر.

ز- أن يكون نشاط المكلف (المؤجر) يتوافق مع نشاط مشروع البناء والتشغيل والتحويل.

ZATCA’s English version

1. Build and operate projects refer to investments contracts to provide productive assets that generate income. The lessor undertakes constricting the productive assets that generate income and it is operation against the benefit generate there from for the lessee (benefit / production) in return for commitment to the lease payments for the benefit of lessor. Build and operate contracts vary in their forms, mechanisms, and objectives, including, but not limited to:

a) Contracts of Build, Operate and Transfer (BOT)

b) Contracts of Build, Own, Operate and Transfer (BOOT)

c) Contracts of Build, Own, and Operate (BOO)

d) Contracts of Acquisition, Operate and Transfer (AOT)

2. For the purposes of this article, lessor means: Builder, producer, developer or seller of the benefit, product or service in contracts of build, operate and transfer ownership in all their forms.

3. For the purposes of this article, lessee means: beneficiary or buyer of the benefit, product or service in contracts of build, operate and transfer ownership in all their forms.

4. BOT projects and such similar forms shall be deducted by the lessor if the following conditions are met:

a) Lessor commitment to establish the project.

b) Lessor commitment to operating the project for selling the benefit, product or the service during the period of the contract.

c) Lessor - or its assignee- commitment to buying the benefit, product or the service during the period of the contract.

d) The subject of the contract shall be mainly the operation of the asset for the purpose of producing and selling the benefit, product or the service, but not funding the asset itself. However, if found that the fact of the transaction is funding the asset, it shall not be deducted from Zakat Base regardless its classification in the financial statements.

e) The lessor may not be one of the Zakat Payers of the financing activities.

f) These assets shall be classified as non-current assets of the lessor.

g) The activity of the lessor shall be aligned with the activity of BOT project.

The text as the Zakat, Tax and Customs Authority (ZATCA) publishes it. The explanation above is for guidance, not tax advice; the Arabic text is the one that governs.

Related articles

Deductions from the zakat baseSpecial schemes

Sources

  1. اللائحة التنفيذية لجباية الزكاة (1445هـ) — هيئة الزكاة والضريبة والجمارك
  2. Implementing Regulations for Zakat Collection 1445 H (2024) — Zakat, Tax and Customs Authority (ZATCA)

Checked on: 5 November 2026. The explanation is written from the article’s text alone, for guidance; it is not legal advice.