Joinery and bespoke furniture workshops: kitchens, wardrobes and on-site measurements, with no cutting before the drawing is approved.
The measurement is taken once, and a two-centimetre error means remaking the unit at the workshop’s cost.
Timber and fittings are bought for a job, and one job’s offcuts get mixed with another’s.
Payments are tied to approval, manufacture and installation stages, and are claimed late.
A step with no app icon beside it is not covered by a JooDax app yet.
Site measurements and an approved drawing signed by the client before any cutting.
Boards, fittings and quantities per unit, showing cost before the price is set.
A payment at approval, one at manufacture and a final one after installation.
An installation date and a client snag list closed before the final payment.